Sales & Technical: 03 376 5205 | info.helifix.nz@leviat.com
Based on visits to four case study sites around Christchurch following the 2010 Darfield earthquake, the 2011 February earthquake and the June 2011 aftershock, the report concludes:(1) the DryFix system is “effective in improving the out-of-plane performance” of the external masonry veneer in cavity brick construction; and(2) HeliBar and HeliBond used together are “effective in repairing in-plane cracks and corner cracks in earthquake damaged unreinforced masonry buildings.”